| Installation | ||||
| A special mandrel attachment is driven into the soil before the pipe, in order to avoid any risk of damage on the pile. Then the piles are driven into the ground with up to one meter left exposed, laser leveled and cut to provide an even base. Finally, pre-split panels in the sides of the tube are forced open, doubling the diameter of the pile, securing it in the ground and aiming it to take immediate high momentum, tension, compression and lateral loadings. Depending on the environment and conditions, concrete filling with or without armament may be done. The environmental effect is minimal during the driving work, which can also be done without significant disturbance on the ordinary operation. |
||||
| Each installation is documented in the protocol. It specifies the length, time of driving, deviations, special events, etc. | Installation method is determined on a case -from the current ground conditions, type of loading, thought highly of the construction and authority and standards required. |